The field has irregular shape, a sloping topography and it abuts a public road along its southern boundary. The house is located on the southern part of the field and the remaining part is vacant. It was constructed around 2005 and it is well-maintained.
Internally, on the ground floor consists of living/dining area, kitchen with siting/ dining area, utility room and guest toilet. The 1st floor consists of three bedrooms the master bedroom with shower en-suite, a communal bathroom and covered veranda. The house has an internal area of 220sq.m (approx.), plus 28sq.m (approx.) covered verandas.
Outside it has covered and uncovered parking spaces and a yard with garden and swimming pool.
The property has total land area of 8696sqm.
It is noted that the house is occupied.
District: Limassol
Municipality: Pissouri
Title deed: The property has a separate title deed
Detached two storey house in Ayia Fylaksi Quarter, of Limassol municipality.
The house was built in circa 2006 and consists of ground floor and first floor. On the ground floor it consists of a living room, a dining room, a kitchen with a dining area, a small laundry room and toilet
Description
The property is a 4 bedroom house in Apostoloi Petros & Pavlos.
The house is built within a plot with an area of 559sqm. It has an internal area of 419sqm, 40sqm covered verandas, 65sqm uncovered verandas and 61sqm basement. The ground floor consists of an open-plan living, dining and bar
Τwo-storey house with an attic and two bedrooms, located in the community of Agros, in the Limassol District.
The parcel has an irregular shape, an even surface, and abuts a registered road along its western border with a frontage of approximately 58 meters, which is also a cul-de-sac street. The residence
Τwo-storey villa in a quiet location in Erimi Community in Limassol District.
The property is situated close to all necessary amenities and services such as supermarkets, schools, restaurants, etc. In addition, it enjoys good access to the motorway, the city of Limassol and the neighbouring communities.
The house was constructed in 2008,